Construction of a Stormwater Retention Basin Near Herndon and DeWolf Avenues (Pup Creek Basin), Channel Re-Alignment and Culvert Replacement

2 Documents in Project

Summary

SCH Number
2012021052
Lead Agency
Fresno Metropolitan Flood Control District
Document Title
Construction of a Stormwater Retention Basin Near Herndon and DeWolf Avenues (Pup Creek Basin), Channel Re-Alignment and Culvert Replacement
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2012
Present Land Use
Currently Vacant/Rural Residential
Document Description
Construction of a storm water retention basin south of the Enterprise Canal at Pup Creek. The basin design will provide 200 acre-feet of storage for storm water. The culverts on Pup Creek that go under the Enterprise Canal will be replaced to increase capacity and prevent water from overtopping the Enterprise Canal banks and potential flooding downstream. Pup Creek will be re-routed to flow across the basin site to a control structure at the south of the property.

Contact Information

Name
Kristine Johnson
Agency Name
Fresno Metropolitan Flood Control District
Contact Types
Lead/Public Agency

Location

Cities
Clovis
Counties
Fresno
Cross Streets
Herndon and DeWolf
Parcel #
553-120-05S
State Highways
Hwy 168
Schools
Cedarwood ES
Waterways
Enterprise Canal
Township
13S
Range
21E
Section
1
Base
MDB&M

Notice of Determination

Approving Agency
Fresno Metropolitan Flood Control District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print