SCH Number 2011111049


Project Info

Title
Campo Verde Solar Energy Storage System
Description
An EIR was prepared for the Campo Verde Solar Project and certified in 2012. The current project is an amendment to an existing conditional use permit (11-0007) for a proposed battery energy storage facility that will charge from the electricity generated by the Campo Verde Solar facility and connect to the existing on-site substation which interconnects with the Imperial Valley Substation. The project will be built in 2 phases: Phase 1 is a 424 sf metal modular battery system container on a concrete foundation occupying 707 sf including a power distribution panel, and other components. Phase 2 is a 12,300 sf metal building with battery racks on a concrete foundation with electrical switch gear and other equipment occupying 16,086 sf. Phase 2 will be capable of storing 5 megawatt hours of electricity; phase 2 will store 100 MWH.
Download CSV New Search

 

8 documents in project

Type Lead/Public Agency Received Title
Imperial County Campo Verde Solar Energy Storage System
Imperial County Campo Verde Solar Energy Storage System
Imperial County Campo Verde Solar Energy Project
Imperial County Campo Verde Solar Energy Project
Imperial County Campo Verde Solar Energy Project
Imperial County Campo Verde Solar Energy Project
Imperial County Campo Verde Solar Energy Project
Imperial County Campo Verde Solar Energy Project