Campo Verde Solar Energy Project

8 Documents in Project

Summary

SCH Number
2011111049
Lead Agency
Imperial County
Document Title
Campo Verde Solar Energy Project
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2012
Present Land Use
Agriculture, non-food crops. Z: A-2- General Agriculture, A-2-R-General Agriculture, Rural Zone, and A-3 Heavy Agriculture.
Document Description
The Campo Verde Solar Reduced size Alternative #3 Project includes a Conditional Use Permit No. 11-0007 authorizing construction of a normal 140-megawatt alternating current solar photovoltaic (PV) energy generation project on approximately 1,443 acres. Campo Verde Solar will build a 140 megawatt alternating current solar generation facility on private land and build an associated 230 - kilovolt (kV) transmission line (gen-tie). The proposed gen-tie crossed both private and public lands (BLM). The gen-tie will connect the solar generation facility to the Imperial Valley Substation. Following the end of its operational life, the project will be decommissioned and the site will be restored to its pre-project condition.

Contact Information

Name
David Black
Agency Name
Imperial County
Contact Types
Lead/Public Agency

Location

Cities
El Centro
Counties
Imperial
Cross Streets
Drew Road and I-8
Zip
92243
Total Acres
1,990
Parcel #
Various
State Highways
Hwy 98
Schools
Westside School
Waterways
Westside Main Canal
Township
16S
Range
12E
Section
Variou
Base
SBB&M

Notice of Determination

Approving Agency
Imperial County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print