Campo Verde Solar Energy Project

8 Documents in Project

Summary

SCH Number
2011111049
Lead Agency
Imperial County
Document Title
Campo Verde Solar Energy Project
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2013
Present Land Use
Agriculture, non-food crops. Z: A-2- General Agriculture, A-2-R-General Agriculture, Rural Zone, and A-3 Heavy Agriculture.
Document Description
CDFW is executing a Lake or Streambed Alteration Agreement (SAA#1600-2012-0123-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant: Campo Verde Solar, LLC (Permittee), represented by Mr. Brian Kunz, 525 Market Street, 15th Floor, San Francisco, CA 94105, Phone (415) 935-2500. The project is proposed to be developed to produce and sell electricity and all renewable and environmental attributes to an electric utility purchaser. The project consists of two primary components: (i) generation and associated facilities on privately owned land (the "Solar Energy Facility Site") and (ii) an up to ~one-mile, double-circuit 230-kilovolt (kV) aboveground electrical line (the "Gen-Tie Line") that will connect the Solar Energy Facility Site with the Imperial Valley Substation. The Permittee proposes to use First Solar, Inc. PV modules that convert sunlight into direct current (DC) electricity.

Contact Information

Name
Dr. Shankar Sharma
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
El Centro
Counties
Imperial
Cross Streets
Drew Road and I-8
Zip
92243
Total Acres
1,990
Parcel #
Various
State Highways
Hwy 98
Schools
Westside School
Waterways
Westside Main Canal
Township
16S
Range
12E
Section
Variou
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.