SCH Number 2011102050


Project Info

Title
Fallbrook Wastewater Treatment Plant Rehabilitation
Description
The Project will improve reliability and increase efficiency of the WWTP, and will provide better management of reclaimed water. The Project will involve: 1) constructing a new lift station, blower building, and an additional secondary clarifier; 2) installing new high efficiency blowers, dissolved oxygen controls, new reclamation filters, flow gauges, valves, controllers, internal mixed liquor recycled systems, baffles, mixers and dechlorination equipment; 3) rehabilitating the headworks and the operations center (lab, bathrooms and work areas); 4) removing a primary clarifier, and converting the primary clarifier into an emergency storage; 5) converting the existing overflow holding tank into an odor control facility; 6) rehabilitating and lining the equalization basin, including adding a diver wall in the equalization basin to separate and manage secondary and filtered effluents; 7) rehabilitating the existing reclamation facilities (flocculation and filtration); 8) installing an additional sludge dewatering centrifuge, and modifying the existing sludge dryer; 9) demolishing and existing pump station; 10) installing and modifying piping; and 11) upgrading the electrical system, and the supervisory control and data acquisition system.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Fallbrook Public Utility District Fallbrook Public Utility District Wastewater Treatment Plant Rehabilitation
Fallbrook Public Utility District Fallbrook Public Utility District Wastewater Treatment Plant Rehabilitation
Fallbrook Public Utility District Fallbrook Wastewater Treatment Plant Rehabilitation