SCH Number 2011071038
Project Info
- Title
- UCLA Engineering VI - Phase 1 Building Project
- Description
- UCLA proposes the construction and operation of a new, 6-level (including 1 basement level), 62,500-gross square foot (gsf) research laboratory building for the Henry Samueli School of Engineering and Applied Science (HSSEAS). The proposed Engineering Building has been designed to co-locate existing multi-disciplinary research programs that are engaged in the development of energy efficient systems based on green technology: Western Institute of Nanoelectronics (WIN), Functional Engineered Nano Architectonics (FENA), and Molecular Engineered Energy Materials (MEEM). Construction is anticipated to begin in June 2012 with completion by September 2014 for duration of approximately 28 months.
2 documents in project