Engineering VI -Phase I Project

2 Documents in Project

Summary

SCH Number
2011071038
Lead Agency
University of California, Los Angeles
Document Title
Engineering VI -Phase I Project
Document Type
NOD - Notice of Determination
Received
Posted
11/14/2011
Present Land Use
Educational
Document Description
UCLA proposes the construction and operation of a new, 6-level (including 1 basement level), 62,500-gross square foot (gsf) research laboratory building for the Henry Samueli School of Engineering and Applied Science (HSSEAS). The proposed Engineering Building has been designed to co-locate existing multi-disciplinary research programs that are engaged in the development of energy efficient systems based on green technology: Western Institute of Nanoelectronics (WIN), Functional Engineered Nano Architectonics (FENA), and Molecular Engineered Energy Materials (MEEM). Construction is anticipated to begin in June 2012 with completion by September 2014 for duration of approximately 28 months.

Contact Information

Name
Tracy Dudman
Agency Name
University of California, Los Angeles
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Charles E. Young Drive
Zip
90024
Total Acres
1.22
State Highways
I-405
Schools
Corrine A. Seeds ES

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print