SCH Number 2011031082
Project Info
- Title
- Watkins Gate Well and Pipeline Project
- Description
- The California Department of Public Health (Department), as the Responsible Agency, will be issuing a water supply permit to operate. The proposed project is to construct a water supply well to provide to Marina Coast Water District's (MCWD) existing water supply distribution system; a well house to enclose the well; an electrical building to enclose motor controls, mechanical and electrical appurtenances; a backup emergency power generator; and an associated distribution pipeline. The well would connect to an existing 24-inch water line connection with the installation of 2,500 feet of a new water conveyance pipeline to be located within the paved roadway of Watkins Gate Road in the East Garrison area of MCWD's Ord community service area. A test well will be installed and monitored prior to the construction of the well. If the test well is determined operational, the well will be made a permanent monitoring well.
3 documents in project