Watkins Gate Well and Pipeline Project

3 Documents in Project

Summary

SCH Number
2011031082
Lead Agency
Marina Coast Water District
Document Title
Watkins Gate Well and Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
5/19/2011
Present Land Use
The project site is located within the former Fort Ord, which was previously a U.S. Army base. Future development has been planned for the former Fort Ord base as part of the Fort Ord Reuse Plan, adopted in 1997 by the Fort Ord Reuse Authority (FORA). The proposed well site and associated water conveyance pipeline is located within an area designated for planned development as a mixed use district in the FORA Plan.
Document Description
The proposed Watkins Gate Well Pipeline Project is comprised of a water supply well to provide water to the MCWD's existing water supply distribution system; a well house to enclose the well; an electrical building to enclose motor controls, mechanical, and electrical appurtenances; a backup emergency power generator; and an associated distribution pipeline. The location of the 16-inch, 400 or 900-foot deep (approximate, preliminary values) well is proposed adjacent to the intersection of Watkins Gate Road and Reservation Road. The determination of the final well depth will depend upon the geological findings of a previously drilled test hole. The well would connect to an existing 24-inch water line connection with the installation of 2,500 feet of a new water conveyance pipeline to be located within the paved roadway of Watkins Gate Road in the East Garrison area of MCWD's Ord Community service area. A test well would be installed and monitored prior to construction of the well. If the test well is determined operational, the well will be made permanent monitoring well.

Contact Information

Name
Gary Rogers
Agency Name
Marina Coast Water District
Contact Types
Lead/Public Agency

Location

Cities
Marina
Counties
Monterey
Cross Streets
Watkins Gate Road / Reservation Road
Zip
93933
Total Acres
~1
Parcel #
031011031000
Waterways
Salinas River

Notice of Determination

Approving Agency
MCWD
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.