SCH Number 2010101060


Project Info

Title
Buck Gulley Restoration Project
Description
The project involves the installation of three (3) stepped-gabion grade control structures in the lower reach of Buck Gully, the installation of five (5) bend-way weirs in the upper portion of Buck Gully, and associated grading. Immediately upstream from the last two (furthest downstream) gabion grade control structures, two subsurface flow wetlands will be created.
Download CSV New Search

 

3 documents in project

Type Lead Agency Received Title
City of Newport Beach SAA#1600-2010-0317-R5
City of Newport Beach Buck Gulley Restoration Project
City of Newport Beach Buck Gulley Restoration Project

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.