SAA#1600-2010-0317-R5

3 Documents in Project

Summary

SCH Number
2010101060
Lead Agency
City of Newport Beach
Document Title
SAA#1600-2010-0317-R5
Document Type
NOD - Notice of Determination
Received
Posted
2/3/2011
Present Land Use
The General Plan, adopted July 25, 2006, Land Use Elements, designates the areas within the project site as Single-Unit Residential Detached (RS-D) and Open Space (OS), and, at the outfall to the Pacific Ocean, Parks and Recreation (PR). Pursuant to the City of Newport Beach Zoning Code, the proposed project is within areas designated Single-Family Residential (R-1) and Residential Combining District (R-1-B).
Document Description
The project involves the installation of three (3) stepped-gabion grade control structures in the lower reach of Buck Gully, the installation of five (5) bend-way weirs in the upper portion of Buck Gully, and associated grading. Immediately upstream from the last two (furthest downstream) gabion grade control structures, two subsurface flow wetlands will be created.

Contact Information

Name
Mr. Barabe
Agency Name
CA Dept. of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
East Coast Highway/ Hazel Drive
Zip
92663
Total Acres
7
Parcel #
Multiple
State Highways
Hwy 1
Railways
None
Airports
None
Schools
Yes
Waterways
Buck Gully/Pacific Ocean
Township
7S
Range
9W
Section
6
Base
SBB&M
Other Location Info
City/Nearest Community: Corona Del Mar

Notice of Determination

Approving Agency
City of Newport Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print