Buck Gulley Restoration Project

3 Documents in Project

Summary

SCH Number
2010101060
Lead Agency
City of Newport Beach
Document Title
Buck Gulley Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
1/31/2011
Present Land Use
The General Plan, adopted July 25, 2006, Land Use Elements, designates the areas within the project site as Single-Unit Residential Detached (RS-D) and Open Space (OS), and, at the outfall to the Pacific Ocean, Parks and Recreation (PR). Pursuant to the City of Newport Beach Zoning Code, the proposed project is within areas designated Single-Family Residential (R-1) and Residential Combining District (R-1-B).
Document Description
Note: Review per lead The project proposes installing stepped-gabion (wire-mesh baskets filled with river rock) grade control structure with subsurface flow wetlands in the lower reach of Buck Creek and bend-way weirs along the upper bend of the creek. The gabion and weir structures would limit stream bed erosion during flood events, particularly along the base of the canyon slopes to reduce the potential of slope erosion or failure which in turn could lead to damage of existing residential structures located at the top of these slopes. The construction, disturbed areas would be re-vegetated with a native plant palette.

Contact Information

Name
Mr. Robert Stein
Agency Name
City of Newport Beach
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
East Coast Highway/ Hazel Drive
Zip
92663
Total Acres
7
Parcel #
Multiple
State Highways
Hwy 1
Railways
None
Airports
None
Schools
Yes
Waterways
Buck Gully/Pacific Ocean
Township
7S
Range
9W
Section
6
Base
SBB&M
Other Location Info
City/Nearest Community: Corona Del Mar

Notice of Determination

Approving Agency
City of Newport Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.