SCH Number 2010052031


Project Info

Title
Main Street Landing Boat Dock Improvement Project
Description
The project includes the construction and operation of a new recreational boat dock. The boat dock will be 226 ft. in length, 10 ft. in width, and a removable, floating kayak dock system 13 ft. in length will be attached. A gangway and ramp will also be constructed to connect the dock to the existing floodwall and will be 51 ft. in lenth. The gangway will be connected to a winch system taht will enable the gangway to be adjusted based on the changing water level. Upstream of the new dock a debris barrier will be constrcuted to provide protection to the dock. The debris barrier will be combination of four 3 pile dolphin structures and a 24 inch foamfilled steel pipe (floating camel) system, approximately 130 ft. in length, angled to intercept and deflect debris into the main channel of the river where it will bypass the dock.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Napa Main Street Landing Boat Dock Improvement Project
City of Napa Main Street Landing Boat Dock Improvement Project
City of Napa Main Street Landing Boat Dock Improvement Project