Main Street Landing Boat Dock Improvement Project

3 Documents in Project

Summary

SCH Number
2010052031
Lead Agency
City of Napa
Document Title
Main Street Landing Boat Dock Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/10/2012
Present Land Use
PLU: Napa River Z: Downtown Commercial within the Floodplain
Document Description
The project includes the construction and operation of a new recreational boat dock. The boat dock will be 226 ft. in length, 10 ft. in width, and a removable, floating kayak dock system 13 ft. in length will be attached. A gangway and ramp will also be constructed to connect the dock to the existing floodwall and will be 51 ft. in lenth. The gangway will be connected to a winch system taht will enable the gangway to be adjusted based on the changing water level. Upstream of the new dock a debris barrier will be constrcuted to provide protection to the dock. The debris barrier will be combination of four 3 pile dolphin structures and a 24 inch foamfilled steel pipe (floating camel) system, approximately 130 ft. in length, angled to intercept and deflect debris into the main channel of the river where it will bypass the dock.

Contact Information

Name
Donn Oetzel
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Napa
Counties
Napa
Cross Streets
Main St and 3rd St
Zip
94559
State Highways
SR 29, 121
Waterways
Napa River, Napa Creek

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.