SCH Number 2010011063


Project Info

Title
Crown Cove Dock Project
Description
The proposed Project involves the construction of a new recreational dock at the Crown Cove Aquatic Center. A concrete sidewalk would be constructed to extend from the existing paved driveway area, which would slope down to a concrete abutment connecting to an accessible 8-foot wide gangway. The gangway would extend approximately 100 feet and would connect to a 20-foot by 30-foot long fiberglass floating platform held in place with two concrete piles driven into the bay floor. The dock would be accessible to the general public; however, the main purpose of the dock is to support educational programs offered at the aquatic center. Construction of the dock will allow the Crown Cove Aquatic Center to expand its curriculum and to provide instruction to a greater number of students.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
California Department of State Parks, Division of Boating and Waterways Crown Cove Dock Project
California Department of State Parks, Division of Boating and Waterways Crown Cove Dock Project
California Department of State Parks, Division of Boating and Waterways Crown Cove Dock Project