SCH Number 2009111096
Project Info
- Title
- Flume 7 Well and Transmission Main Pipeline Replacement Project
- Description
- The CA Department of Public Health (CDPH), as the Responsible Agency, will be issuing a water supply permit to city of Riverside for the installation of Flume 7 raw water production well and construction of ~1,350 linear feet of 30-inch diameter steel transmission pipeline to convey water produced by Flume 7 to the JW North Treatment Plant.
3 documents in project