Flume 7 Well and Transmission Main Pipeline Replacement Project

3 Documents in Project

Summary

SCH Number
2009111096
Lead Agency
City of Riverside
Document Title
Flume 7 Well and Transmission Main Pipeline Replacement Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
PLU: Planned Community Development GP: Light Industrial and Low Density Residential
Document Description
The City of Riverside intends to install the proposed Flume 7 raw water production well in the Riverside Groundwater Basin and construct ~1,550 linear ft (LF) of 30 inch diameter steel transmission pipeline replacing the existing 48 inch diameter transmission pipeline. The proposed Flume 7 well is located in the Riverside North Groundwater Basin and within the City's existing right-of-way and easements. The Project site is within the city of Colton just beyond the westerly extend of Washington Street. The City intends to treat the water extracted by the Flume 7 well at the new John W. North Treatment Plant, located ~1,500 ft to the southwest of Flume Well 7, and export this water to the City's service area in Riverside County. Portions of the Flume Transmission Main have been replaced in 1982 and again in 2007. The remaining reach (1,550 LF) from south of the Santa Ana River to the John W. North Treatment Plant, will be replaced as part of this project. This reach is located within City-owned right-of-way and pipeline easements. The pipeline will be trenched into the river levee. The well will have provisions for and emergency power hookup so that a portable trailer mounted diesel-fueled generator could be brought out to the site. This generator, however, would not be stored on site when it is not in use. The well is anticipated to have a maximum pumping capacity of 2,500 gallons per minute (GPM).

Contact Information

Name
Blake Yamamoto
Agency Name
City of Riverside Public Utilities Department
Contact Types
Lead/Public Agency

Location

Cities
Colton
Counties
San Bernardino
Cross Streets
~100 ft from the intersection of E. Washington St and Milano Wy
Zip
92324
State Highways
I-91, 215 and I-10
Railways
UPRR
Airports
No
Schools
Colton Joint USD
Waterways
Santa Ana River
Township
1S
Range
4W
Base
SBB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Fish and Wildlife, Region 6, Department of Water Resources, Office of Emergency Services, California, Resources Agency, State Water Resources Control Board, Division of Water Rights, Department of Toxic Substances Control, California Department of Health Care Services (DHCS)
State Reviewing Agency Comments
Department of Toxic Substances Control, California Department of Health Care Services (DHCS)
Development Types
Other (groundwater well and pipeline)
Local Actions
public works
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print