Flume 7 Well and Flume Transmission Main Replacement Project

3 Documents in Project

Summary

SCH Number
2009111096
Lead Agency
Riverside, City of (City of Riverside)
Document Title
Flume 7 Well and Flume Transmission Main Replacement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The CA Department of Public Health (CDPH), as the Responsible Agency, will be issuing a water supply permit to city of Riverside for the installation of Flume 7 raw water production well and construction of ~1,350 linear feet of 30-inch diameter steel transmission pipeline to convey water produced by Flume 7 to the JW North Treatment Plant.

Contact Information
Steve Williams
CA CDPH
1350 Front Street, Room 2050
San Diego, CA 92101

619 525-4159

Location

Cities
Colton
Counties
San Bernardino
Cross Streets
~100 ft from the intersection of E. Washington St and Milano Wy
Zip
92324
State Highways
I-91, 215 and I-10
Railways
UPRR
Airports
No
Schools
Colton Joint USD
Waterways
Santa Ana River
Township
1S
Range
4W
Base
SBB&M

Notice of Determination

Approving Agency
CDPH
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search