SCH Number 2009011069


Project Info

Title
Clair Well #5 - Drilling Development of a Third Groundwater Well for Portable Water at Existing Well Site
Description
The Golden State Water Company proposes to construct an additional well at the Clair Plant Site, where two wells are currently in operation. As part of the project, new yard piping to connect the well to the existing distribution system would be installed. A site drain line for waste discharge would also be installed and be connected to an existing storm and associated piping. In the event that treatment would be needed to remove perchlorate, one of the existing wells (Clarie Well #3) would be removed and the space used for treatment vessels. Sodium hypochlorite would be injected to maintain a pre-determined disinfectant in the water.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
California Department of Public Health (CDPH) New Clair Well #5 for the Golden State Water Company
California Department of Public Health (CDPH) Clair Well #5 - Drilling Development of a Third Groundwater Well for Portable Water at Existing Well Site