New Clair Well #5 for the Golden State Water Company
2 Documents in Project
Summary
SCH Number
2009011069
Lead Agency
California Department of Public Health
(CDPH)
Document Title
New Clair Well #5 for the Golden State Water Company
Document Type
NOD - Notice of Determination
Received
Posted
3/19/2009
Document Description
The Golden State Water Company proposes to construct an additional well at the Clair Plant Site, where two wells are currently in operation. As part of the project, new yard piping to connect the well to the existing distribution system would be installed. A site drain line for waste discharge would also be installed and be connected to an existing storm and associated piping. In the event that treatment would be needed to remove perchlorate, one of the existing wells (Clarie Well #3) would be removed and the space used for treatment vessels. Sodium hypochlorite would be injected to maintain a pre-determined disinfectant in the water.
Contact Information
Name
Veronica Malloy
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Stanton
Counties
Orange
Cross Streets
Cerritos and Fern Avenues
Zip
90680
Total Acres
0.3
Parcel #
126-441-01
State Highways
39
Railways
Pacific Railroad
Airports
No
Schools
multiple
Waterways
No
Township
4S
Range
11W
Section
24
Base
SB
Notice of Determination
Approving Agency
CA Department of Public Health
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.