SCH Number 2008102085


Project Info

Title
Rosemore-Woodland 69-kV Transmission Line Project
Description
The MID proposes build a 69-kV transmission line connecting the Woodland Generation Station to the newly expanded 230/69/12-kV Rosemore Substation. MID would construct approx. two miles of 69-kV transmission line along Woodland Ave. (Woodland), Carpenter Rd. (Carpenter), and MID Lateral No. 4 to provide a direct connection between the two substations. The new 69-kV transmission line would be overbuilt above the existing 12-kV distribution taller poles. The alternate route along the remainder of the route along Carpenter a separate 60-kV transmission line will be constructed on the opposite side of the roadway. The new 69-kV line would be located in public rights-of-way along Woodland and Carpenter and on MID property along the canal. Although most of the route is adjacent to commercial and industrial land use, the route also passes through residential areas and agricultural lands.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Modesto Irrigation District Modesto Irrigation District Rosemore-Woodland 69kV Transmission Line Project
Modesto Irrigation District Rosemore-Woodland 69-kV Transmission Line Project