Modesto Irrigation District Rosemore-Woodland 69kV Transmission Line Project

2 Documents in Project

Summary

SCH Number
2008102085
Lead Agency
Modesto Irrigation District
Document Title
Modesto Irrigation District Rosemore-Woodland 69kV Transmission Line Project
Document Type
NOD - Notice of Determination
Received
Posted
12/9/2008
Present Land Use
General Agriculture, Highway Commercial, Industrial, Light Industrial, Low-Density Residential, Planned Development, Rural Residential
Document Description
The MID proposes build a 69-kV transmission line connecting the Woodland Generation Station to the newly expanded 230/69/12-kV Rosemore Substation. MID would construct approx. two miles of 69-kV transmission line along Woodland Ave. (Woodland), Carpenter Rd. (Carpenter), and MID Lateral No. 4 to provide a direct connection between the two substations. The new 69-kV transmission line would be overbuilt above the existing 12-kV distribution taller poles. The alternate route along the remainder of the route along Carpenter a separate 60-kV transmission line will be constructed on the opposite side of the roadway. The new 69-kV line would be located in public rights-of-way along Woodland and Carpenter and on MID property along the canal. Although most of the route is adjacent to commercial and industrial land use, the route also passes through residential areas and agricultural lands.

Contact Information

Name
Clifford Ball
Agency Name
Modesto Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Modesto
Counties
Stanislaus
Cross Streets
Woodland Avenue and North Carpenter Road
Zip
95351
Total Acres
7.3
Parcel #
various
State Highways
SR-99
Railways
Southern Pacific
Schools
15
Waterways
Tuolumne River, Lateral No. 4
Township
3S
Range
8E
Section
25&30
Base
MDM

Notice of Determination

Approving Agency
Modesto Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print