SCH Number 2006081094
Project Info
- Title
- Robert B. Diemer Treatment Plant North Access Road
- Description
- Note: Addendum No. 1 to the Final EIR for the Robert B. Diemer Treatment Plant North Access Road Project The original project consists of the construction of the North Access Road to the Robert B. Diemer Treatment Plant for use as an emergency secondary access road. The fully-constructed roadway would range from 30-40 feet wide, including a 28-foot wide paved road, which would include storm drain facilities, waterline system to accommodate fire hydrants and irrigation, and a system of earth retaining structures. The roadway length would be approximately 1.3 miles.
6 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Metropolitan Water District of Southern California | Addendum No. 1 to the Final EIR for the Robert B. Diemer Treatment Plant North Access Road Project | |
NOD | Metropolitan Water District of Southern California | Robert B. Diemer Treatment Plant North Access Road | |
FIN | Metropolitan Water District of Southern California | Robert B. Diemer Treatment Plant North Access Road | |
EIR | Metropolitan Water District of Southern California | Robert B. Diemer Treatment Plant North Access Road | |
EIR | Metropolitan Water District of Southern California | Robert B. Diemer Treatment Plant North Access Road | |
NOP | Metropolitan Water District of Southern California | Robert B. Diemer Treatment Plant North Access Road |