SCH Number 2006061114


Project Info

Title
Byrd High School Reconfiguration
Description
The proposed project includes the reconfiguration and modernization of the existing middle school campus for operations as the proposed Byrd High School. The proposed project would provide 1,620 two-semester seats for grades nine through twelve. The proposed project includes external alterations, including building painting; internal reconfigurations would include reconfiguration organization of the existing buildings for high school uses. The proposed project would also entail development of a new 12,137 sf gymnasium with locker rooms near Sheldon Street.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Los Angeles Unified School District Byrd High School Reconfiguration
Los Angeles Unified School District Byrd High School Reconfiguration
Los Angeles Unified School District Byrd High School Reconfiguration