Byrd High School Reconfiguration
3 Documents in Project
Summary
SCH Number
2006061114
Lead Agency
Los Angeles Unified School District
Document Title
Byrd High School Reconfiguration
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2007
Present Land Use
Byrd Middle School/ PF-1XL Public Facilities Zone/ Public Facilities (PF)
Document Description
The proposed project includes the reconfiguration and modernization of the existing middle school campus for operations as the proposed Byrd High School. The proposed project would provide 1,620 two-semester seats for grades nine through twelve. The proposed project includes external alterations, including building painting; internal reconfigurations would include reconfiguration organization of the existing buildings for high school uses. The proposed project would also entail development of a new 12,137 sf gymnasium with locker rooms near Sheldon Street.
Contact Information
Name
John Moreno
Agency Name
Los Angeles Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Los Angeles
Counties
Los Angeles
Cross Streets
9171 Telfair Avenue
Zip
91352
Total Acres
18.5
Parcel #
8119-011-902
State Highways
SR-170, I-5, SR-118
Railways
Metrolink, BNSF
Schools
Byrd Middle School
Other Location Info
City/Nearest Community: Sun Valley
Notice of Determination
Approving Agency
Los Angeles Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.