SCH Number 2006049058
Project Info
- Title
- Pierson Boulevard Sewer Interceptor Project
- Description
- The Department is issuing a Lake and Streambed Alteration Agreement for the project proponent who proposes to connect two existing reservoirs and allow for the unrestricted transfer of potable water. In the southeastern portion of the project, a +/- 300 foot segment of a 16-inch diameter pipe will cross under Long Canyon Wash. A total of approximately 0.061 acres of potential CDFG jurisdiction exists within the proposed construction area, none of which was identified as riparian habitat. Numerous types of construction equipment will be required, including an excavator, loader, backhoe, dozer, compactor, water truck, and construction personnel vehicles. The top six inches of topsoil will be excavated and stockpiled for replacement after construction. Excavation to a maximum depth of 15 feet and width of 50 feet will be required for the underground pipe placement. The excavated soil will be stock piled adjacent to the trench area, and will be back-filled and compacted over the pipes when installed. Excess soil will be hauled off.
2 documents in project