Pierson Boulevard Sewer Interceptor Project

2 Documents in Project

Summary

SCH Number
2006049058
Lead Agency
Mission Springs Water District
Document Title
Pierson Boulevard Sewer Interceptor Project
Document Type
NOD - Notice of Determination
Received
Posted
7/19/2006
Document Description
The Department is issuing a Lake and Streambed Alteration Agreement for the project proponent who proposes to connect two existing reservoirs and allow for the unrestricted transfer of potable water. In the southeastern portion of the project, a +/- 300 foot segment of a 16-inch diameter pipe will cross under Long Canyon Wash. A total of approximately 0.061 acres of potential CDFG jurisdiction exists within the proposed construction area, none of which was identified as riparian habitat. Numerous types of construction equipment will be required, including an excavator, loader, backhoe, dozer, compactor, water truck, and construction personnel vehicles. The top six inches of topsoil will be excavated and stockpiled for replacement after construction. Excavation to a maximum depth of 15 feet and width of 50 feet will be required for the underground pipe placement. The excavated soil will be stock piled adjacent to the trench area, and will be back-filled and compacted over the pipes when installed. Excess soil will be hauled off.

Contact Information

Name
James Sheridan
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Riverside

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.