Pierson Boulevard Sewer Interceptor Project

2 Documents in Project

Summary

SCH Number
2006049058
Lead Agency
Mission Springs Water District
Document Title
Pierson Boulevard Sewer Interceptor Project
Document Type
NOD - Notice of Determination
Received

Document Description
The Department is issuing a Lake and Streambed Alteration Agreement for the project proponent who proposes to connect two existing reservoirs and allow for the unrestricted transfer of potable water. In the southeastern portion of the project, a +/- 300 foot segment of a 16-inch diameter pipe will cross under Long Canyon Wash. A total of approximately 0.061 acres of potential CDFG jurisdiction exists within the proposed construction area, none of which was identified as riparian habitat. Numerous types of construction equipment will be required, including an excavator, loader, backhoe, dozer, compactor, water truck, and construction personnel vehicles. The top six inches of topsoil will be excavated and stockpiled for replacement after construction. Excavation to a maximum depth of 15 feet and width of 50 feet will be required for the underground pipe placement. The excavated soil will be stock piled adjacent to the trench area, and will be back-filled and compacted over the pipes when installed. Excess soil will be hauled off.

Contact Information
James Sheridan
California Department of Fish and Game
78078 Country Club Drive, Suite 109
Bermuda Dunes, CA 92203

(760) 200-9419

Location

Counties
Riverside

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Mission Springs Water District 66575 Second Street Desert Hot Springs, CA 92240

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search