SCH Number 2004102011
Project Info
- Title
- Sly Park Recreation Area Master Plan
- Description
- The 4-acre Hazel Creek and Hazel Creek Campground Restoration Project is located along Hazel Creek, a tributary to Jenkinson Lake, within Sly Park, near Pollock Pines. The project consists of revegetation, minor sediment removal, a bridge replacement, removal of campsites and establishment of a 50-foot setback buffer along Hazel Creek.
10 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | El Dorado Irrigation District | Hazel Creek Campground Restoration Project | |
NOD | El Dorado Irrigation District | Hazel Creek Campground Restoration Project | |
NOD | El Dorado Irrigation District | Hazel Creek and Hazel Creek Campground Restoration Project (SNC 322) | |
NOD | El Dorado Irrigation District | Hazel Creek and Hazel Creek Campground Restoration Project | |
NOD | El Dorado Irrigation District | Hazel Meadow Restoration (SNC 080149) | |
NOD | El Dorado Irrigation District | Hazel Meadow Restoration | |
NOD | El Dorado Irrigation District | Hazel Meadow Restoration | |
NOD | El Dorado Irrigation District | Sly Park Recreation Area Master Plan | |
EIR | El Dorado Irrigation District | Sly Park Recreation Area Master Plan | |
NOP | El Dorado Irrigation District | Sly Park Recreation Area Master Plan |