Hazel Meadow Restoration (SNC 080149)

10 Documents in Project

Summary

SCH Number
2004102011
Lead Agency
El Dorado Irrigation District
Document Title
Hazel Meadow Restoration (SNC 080149)
Document Type
NOD - Notice of Determination
Received
Posted
12/8/2008
Present Land Use
Recreational / "RF" Recreational Facilities, "RA-80" Residential Agricultural & "RA-20" Residential Agricultural / Natural Resource
Document Description
The El Dorado Irrigation Distirct is requesting $66,116 in Sierra Nevada Conservancy Proposition 84 Strategic Opportunity Grant funds to rebuild recreation infrastructure and educational interpretive signage which are components of the Hazel Meadow Restoration Project. The Hazel Meadow project is a portion of the Sly Park Master plan for which a previous Master EIR was prepared. The SNC funding would be used only for the portion of the project which involves the construction of an ADA-accessible boardwalk and viewing platform over an existing compacted pathway through the meadow to the shoreline of Jenkinson Lake.

Contact Information

Name
Jim Branham
Agency Name
Sierra Nevada Conservancy
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Sly Park Road and Mormon Emigrant Trail
Zip
1,660
Total Acres
1,660
Parcel #
Multiple
State Highways
U.S. 50
Waterways
Hazel Creek, Sly Park Creek, Jenkinson Lake
Township
10N
Range
13E
Section
3,8-9
Base
MD
Other Location Info
City/Nearest Community: Pollock Pines

Notice of Determination

Approving Agency
Sierra Nevada Conservancy
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print