Hazel Creek and Hazel Creek Campground Restoration Project
10 Documents in Project
Summary
SCH Number
2004102011
Lead Agency
El Dorado Irrigation District
Document Title
Hazel Creek and Hazel Creek Campground Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
2/13/2009
Document Description
The EID proposes to use SNC grant funds to develop a complete restoration design and file permits for Hazel Creek and Hazel Creek Campground. The restoration will include stabilizing Hazel Creek banks, removing non-native vegetation, recreating a riparian buffer zone along the creek, protect re-vegetated areas and creek with 50 ft setback buffer zone and natural barriers, and construct all weather safety access bridge over the creek. To accomplish the restoration of the creek seven campsites and the associated access road will be removed, along with reconfiguring remaining campsites according to SPRA Master Plan standards. Two campsites will be replaced with ADA accessible cabins. Re-establish native vegetation in the campground, installing barriers, provide access controls and interpretive signage to protect native habitats and provide education opportunities and safety information. A new bridge over Hazel Creek will be added to provide emergency access to the back of Sly Park and to provide a dedicated access for bicycles and horses to cross the creek without causing impacts to Hazel Creek and the water quality of Jenkinson Lake.
Contact Information
Name
Dena McCann
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Counties
El Dorado
Cross Streets
Sly Park Road and Mormon Emigrant Trail
Zip
1,660
Total Acres
1,660
Parcel #
Multiple
State Highways
U.S. 50
Waterways
Hazel Creek, Sly Park Creek, Jenkinson Lake
Township
10N
Range
13E
Section
3,8-9
Base
MD
Other Location Info
City/Nearest Community: Pollock Pines
Notice of Determination
Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.