SCH Number 2004031057


Project Info

Title
West End Pump Station Reconstruction Project
Description
The project proposes to renovate an existing pump station to accommodate the 25-year storm event and reduce flooding risks to existing development. The project will add two electric pumps directly adjacent to existing pump facilities on the east side. Inlet to the new pump facility is provided through a 10-foot wide and 5-foot high box culvert from the wet well area of the existing pump station. A 208 square-foot building will house the new pumps above an added wet well. A single 48-inch diameter discharge pipe will be added to convey flows to the San Gabriel River. In addition, a low flow diversion system will be constructed to convey dry weather flows to the existing sewer system.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Seal Beach West End Pump Station Reconstruction Project
City of Seal Beach West End Pump Station Reconstruction Project
City of Seal Beach West End Pump Station Reconstruction Project