West End Pump Station Reconstruction Project
3 Documents in Project
Summary
SCH Number
2004031057
Lead Agency
City of Seal Beach
Document Title
West End Pump Station Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2004
Present Land Use
General Plan: Residential High Density. Zoning: RHD (Residential High Density). The project site is surrounded by residential uses to the southwest (Seal Beach Trailer Park) and east (Oakwood Apartments). The San Gabriel River and its southerly levee are located to the north of the site.
Document Description
The project proposes to renovate an existing pump station to accommodate the 25-year storm event and reduce flooding risks to existing development. The project will add two electric pumps directly adjacent to existing pump facilities on the east side. Inlet to the new pump facility is provided through a 10-foot wide and 5-foot high box culvert from the wet well area of the existing pump station. A 208 square-foot building will house the new pumps above an added wet well. A single 48-inch diameter discharge pipe will be added to convey flows to the San Gabriel River. In addition, a low flow diversion system will be constructed to convey dry weather flows to the existing sewer system.
Contact Information
Name
Lee Whittenberg
Agency Name
City of Seal Beach
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Seal Beach
Counties
Orange
Cross Streets
First Street and Pacific Coast Highway
Zip
90740
Total Acres
Less than One
State Highways
SR-1 (Pacific Coast Highway)
Schools
McGaugh Elementary
Waterways
San Gabriel River
Notice of Determination
Approving Agency
City of Seal Beach
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.