West End Pump Station Reconstruction Project

3 Documents in Project

Summary

SCH Number
2004031057
Lead Agency
City of Seal Beach
Document Title
West End Pump Station Reconstruction Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
General Plan: Residential High Density. Zoning: RHD (Residential High Density). The project site is surrounded by residential uses to the southwest (Seal Beach Trailer Park) and east (Oakwood Apartments). The San Gabriel River and its southerly levee are located to the north of the site.
Document Description
The project proposes to renovate an existing pump station to accommodate the 25-year storm event and reduce flooding risks to existing development. The project will add two electric pumps directly adjacent to existing pump facilities as well as a new inlet culvert and 208 square-foot building to house the pumps. A single 48-inch discharge pipe will be provided to convey flows to the San Gabriel River. A low flow diversion system is also proposed to convey dry weather flows to the existing sewer system.

Contact Information

Name
Lee Whittenberg
Agency Name
City of Seal Beach
Contact Types
Lead/Public Agency

Location

Cities
Seal Beach
Counties
Orange
Cross Streets
First Street and Pacific Coast Highway
Zip
90740
Total Acres
Less than One
State Highways
SR-1 (Pacific Coast Highway)
Schools
McGaugh Elementary
Waterways
San Gabriel River

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Water Resources, Office of Emergency Services, California, Resources Agency, State Water Resources Control Board, Division of Water Quality, California Coastal Commission (CCC), California Department of Transportation, District 12 (DOT)
State Reviewing Agency Comments
California Coastal Commission (CCC), California Department of Transportation, District 12 (DOT)
Development Types
Other (Stormwater pump station reconstruction)
Local Actions
Capital Impr. project
Project Issues
Aesthetics, Air Quality, Coastal Zone, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Sewer Capacity, Transportation

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print