SCH Number 2003091108
Project Info
- Title
- Calimesa Recycled Water Conveyance Project
- Description
- An addendum to the EIR/EIS was prepared and approved by the Yucaipa Valley Water District (YVWD) Board of Directors in 2016 for the Calimesa Recycled Water Conveyance Project (CRWCP), which included the construction and operation of an additional 18,500 linear feet of 24-inch-diameter recycled water pipeline. Minor project changes are proposed as part of this addendum. No additional significant impacts beyond those analyzed in the EIR/EIS are anticipated as a result of the proposed Calimesa Recycled Water Conveyance Project.
11 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Yucaipa Valley Water District | Calimesa Recycled Water Conveyance Project | |
NOD | Yucaipa Valley Water District | Regional Non Potable Water Distribution System Project - Calimesa Recycled Water Conveyance Project | |
ADM | Yucaipa Valley Water District | Calimesa Recycled Water Conveyance Project | |
NOD | Yucaipa Valley Water District | Regional Non-Potable Water Distribution System Project | |
ADM | Yucaipa Valley Water District | Calimesa Regional Recycled Water Project | |
NOD | Yucaipa Valley Water District | Phase I Non-Potable Water Distribution System Expansion and Salinity Management Project; Water Recycling Funding Program Grant Project No. 3817-030 and WRFP Loa | |
NOD | Yucaipa Valley Water District | Regional Non-Potable Water Distribution System | |
FIN | Yucaipa Valley Water District | Non-Potable Water Distribution System | |
EIR | Yucaipa Valley Water District | Non-Potable Water Distribution System | |
EIR | Yucaipa Valley Water District | Regional Non-Potable Water Distribution System | |
NOP | Yucaipa Valley Water District | Regional Non-Potable Water Distribution System |