SCH Number 2002062067


Project Info

Title
Remedial Action Plan for the PG&E Willows Former Manufactured Gas Plant
Description
The project is the approval of an impacted soil removal workplan by DTSC that would authorize activities related to the mitigation of Polycyclic Aromatic Hydrocarbon, arsenic, and lead found in soil at the Former Willows Manufactured Gas Plant. The contaminated soil is present beneath a warehouse that is scheduled for demolition. Activities to be conducted pursuant to the approved impacted soil removal workplan include: excavate approximately 200 cy of impacted soil and transport it off-site for disposal at a permitted facility; import approximately 200 cy of clean fill; and repair any damage to existing cover currently surrounding the warehouse if needed after soil removal. The existing land use covenant restricting the site to industrial/commercial use and the operation and maintenance agreement with the PG&E Company will remain in place.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Department of Toxic Substances Control Impacted Soil Removal Workplan for Site Improvements at the Former Willows Manufactured Gas Plant
Department of Toxic Substances Control Pacific Gas and Electric (PG&E) Willows
Department of Toxic Substances Control Remedial Action Plan for the PG&E Willows Former Manufactured Gas Plant