Impacted Soil Removal Workplan for Site Improvements at the Former Willows Manufactured Gas Plant
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2002062067
- Lead Agency
- Department of Toxic Substances Control
- Document Title
- Impacted Soil Removal Workplan for Site Improvements at the Former Willows Manufactured Gas Plant
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/21/2015
- Present Land Use
- Industrial
- Document Description
- The project is the approval of an impacted soil removal workplan by DTSC that would authorize activities related to the mitigation of Polycyclic Aromatic Hydrocarbon, arsenic, and lead found in soil at the Former Willows Manufactured Gas Plant. The contaminated soil is present beneath a warehouse that is scheduled for demolition. Activities to be conducted pursuant to the approved impacted soil removal workplan include: excavate approximately 200 cy of impacted soil and transport it off-site for disposal at a permitted facility; import approximately 200 cy of clean fill; and repair any damage to existing cover currently surrounding the warehouse if needed after soil removal. The existing land use covenant restricting the site to industrial/commercial use and the operation and maintenance agreement with the PG&E Company will remain in place.
- Contact Information
-
Duane White
Department of Toxic Substances Control
Lead/Public Agency
8800 Cal Center Drive
Sacramento, CA 95826
Phone : (916) 255-3585
Location
- Cities
- Willows
- Counties
- Glenn
- Cross Streets
- Eastwood Street
- Total Acres
- 1.84
- Parcel #
- 3-081-01
- State Highways
- 162
- Railways
- Southern
- Airports
- Willows Airport
- Waterways
- Glenn-Colusa Canal
- Township
- 19N
- Range
- 3W
- Section
- 10
Notice of Determination
- Approving Agency
- Department of Toxic Substance Control
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 8800 Cal Center Drive, Sacramento, CA 95826
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.