SCH Number 2001081134


Project Info

Title
Miramar Hills Curve Realignment and Second Main Track
Description
The objective of the project is to increase reliability and reduce travel time on a segment of the existing rail corridor that currently has a single-track. The Proposed Project would do the following: 1) Realign the existing railroad track within the existing right-of-way to straighten some curves, 2) Add 3.1 miles of new second track (2.2 miles within the existing railroad right-of-way and 0.9 miles within new right-of-way), and 3) Close a 3.1-mile gap of single-tracked railroad between double-tracked railroad sections at both ends of the project.
Download CSV New Search

 

6 documents in project

Type Lead/Public Agency Received Title
North County Transit District Miramar Hills Curve Realignment and Second Main Track
North County Transit District Sorrento-Miramar Curve Realignment and Second Main Track Project
North County Transit District Sorrento-Miramar Curve Realignment and Second Main Track Project
North County Transit District Miramar Hills Curve Realignment and Second Main Track
North County Transit District Miramar Hills Curve Realignment and Second Main Track
North County Transit District Miramar Hills Curve Realignment and Second Main Track