SCH Number 1997121038


Project Info

Title
Miravale Partnership Hambey Property
Description
The Summerfield Phase 3 Project consists of the same development configuration proposed as part of the Phase 2 development analyzed in the Miravale-Hambey EIR. Specifically, the Summerfield Phase 3 Project (see Figure 2) consists of the development of a total of 46.23 acres, and includes 125 single-family residential lots and Parcel B, an area designated for townhome development. It is possible, however, that due to storm water requirements associated with the City's 2007 Stormdrain Master Plan, a minor portion of the residential development originally proposed as part of the subdivision will be replaced by water quality detention basin(s).
Download CSV New Search

 

5 documents in project

Type Lead/Public Agency Received Title
City of Soledad Miravale Partnership - Hambey Property (Summerfield Phase 3)
City of Soledad Miravale Partnership - Hambey Property (Bryant Canyon Channel Improvements)
City of Soledad Miravale Partnership Hambey Property
City of Soledad Miravale Partnership Hambey Property
City of Soledad Miravale EIR