Fontana Square Project

2 Documents in Project

Summary

SCH Number
2022120502
Lead Agency
City of Fontana
Document Title
Fontana Square Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
The proposed Project is designated under the General Plan Land Use Map as General Commercial (C-G)with a zoning district of General Commercial (C-2).
Document Description
The proposed Project is a commercial development composed of a banquet hall (Development A), a Holiday Inn Express Hotel & Suite and a Staybridge Suites (Development B), a convenience (C-Store)/Restaurant (Development C), and an In-N-Out Burger (Development D). The establishments would be generally located closer to the northern property boundary with most of the vehicle parking stalls along S. Highland Avenue, Citrus Avenue. Parking is also provided throughout the site and between the various establishments. The development would be buffered by decorative landscaping throughout the perimeter of the site. Main ingress and egress to the site would be via a 52’-foot-wide driveway (Driveway No.1), divided a raised median, located directly across from Tokay Avenue. Driveway No.1 would allow for full ingress movements on all directions and would allow southbound, eastbound, and westbound egress onto Tokay Avenue and S. Highland Avenue. Driveway No. 2 is a 35’-foot-wide driveway located on the southwest corner of the site, directly across from Jacaranda Avenue. Driveway No.3 is an approximately 23’-foot-wide-driveway, located on the northwest corner of the site with direct access to Catawba Avenue. Driveway No. 4 is a 35’-foot-wide driveway located southeast portion of the site, directly across Cherimoya Avenue. The proposed development buildings would vary in heights. The tallest structure would be Development B with 5-stories at 65’-7” high. The proposed Project will include trash enclosures throughout the site serving each of the proposed uses. The trash enclosures will have a locking roll-up door and locking device to discourage illegal dumping. The proposed Project will include a fire access route, fire hydrants, and speed humps throughout the site.

Contact Information

Name
Salvador Quintanilla
Agency Name
City of Fontana
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Fontana
Counties
San Bernardino
Regions
Citywide
Cross Streets
16014 S. Highland Avenue
Zip
92336
Total Acres
8.876
Jobs
1
Parcel #
0228-301-01 through -08, 0228-310-20, -21, -22, -23, 0228-310-33 through -49, -51, and 52
State Highways
I-10
Railways
n/a
Airports
n/a
Schools
A.B. Miller High School
Waterways
N/A

Notice of Completion

Development Types
Commercial (Sq. Ft. 168886, Acres 8.876, Employees 1)
Local Actions
Site Plan, Use Permit, Variance, DRP, TPM
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Local Review Period Start
Local Review Period End

Attachments

Download CSV Download All Attachments New Search Print