SCH Number 2022120502
Project Info
- Title
- Fontana Square Project
- Description
- The proposed Project is a commercial development composed of a banquet hall (Development A), a Holiday Inn Express Hotel & Suite and a Staybridge Suites (Development B), a convenience (C-Store)/Restaurant (Development C), and an In-N-Out Burger (Development D). The establishments would be generally located closer to the northern property boundary with most of the vehicle parking stalls along S. Highland Avenue, Citrus Avenue. Parking is also provided throughout the site and between the various establishments. The development would be buffered by decorative landscaping throughout the perimeter of the site. Main ingress and egress to the site would be via a 52’-foot-wide driveway (Driveway No.1), divided a raised median, located directly across from Tokay Avenue. Driveway No.1 would allow for full ingress movements on all directions and would allow southbound, eastbound, and westbound egress onto Tokay Avenue and S. Highland Avenue. Driveway No. 2 is a 35’-foot-wide driveway located on the southwest corner of the site, directly across from Jacaranda Avenue. Driveway No.3 is an approximately 23’-foot-wide-driveway, located on the northwest corner of the site with direct access to Catawba Avenue. Driveway No. 4 is a 35’-foot-wide driveway located southeast portion of the site, directly across Cherimoya Avenue. The proposed development buildings would vary in heights. The tallest structure would be Development B with 5-stories at 65’-7” high. The proposed Project will include trash enclosures throughout the site serving each of the proposed uses. The trash enclosures will have a locking roll-up door and locking device to discourage illegal dumping. The proposed Project will include a fire access route, fire hydrants, and speed humps throughout the site.
2 documents in project