Irvine Animal Care Center and Operations Support Facility Expansion and Renovation

2 Documents in Project

Summary

SCH Number
2022080114
Lead Agency
City of Irvine
Document Title
Irvine Animal Care Center and Operations Support Facility Expansion and Renovation
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
The Project Site is currently zoned 6.1 Institutional and 5.4B General Industrial, with corresponding General Plan Land Use designations of Public Facilities and Research and Industrial.
Document Description
As proposed by the City of Irvine, the project involves an expansion and renovation of the Irvine Animal Care Center (IACC) and Operation Support Facility (OSF) and associated site features and improvements. Under the proposed project, the IACC expansion and renovation plans include an addition to the existing administration building (new entry building), a new clinic building, and an in-fill administration building addition. Also, renovation work is proposed for the existing IACC administration building, cats/small animals housing building, and kennel buildings. Other proposed IACC site improvements include modifications to the existing secured parking area, addition of a trash enclosure, re-grading and addition of drains for better site drainage and storm water treatment, facility entrance modifications, new activity yards, and miscellaneous landscaping. The OSF expansion and renovation plans consist of the addition of new metal structures and interior remodels of existing buildings. The OSF plans includes removal of four pre-engineered/-fabricated metal structures and the addition of two pre-engineered-/-fabricated metal structures for material storage. Also, the existing compressed natural gas and gas/diesel fueling islands would be relocated to a new location within the area of the project site currently housing the dog park. As a part of the project the existing dog park would be removed and relocated to the Oak Creek Community Park, which is in the process of undergoing an expansion and improvement plan that is being processed separately by the City. Once the new dog park at Oak Creek Community Park is constructed and operational, the existing dog park at the project site would be removed and replaced with a new surface parking area for City vehicles. Other proposed OSF site improvements include modifications to the existing secured parking areas, reconfiguration and optimization of the onsite circulation for better traffic flow, new and improved yard lighting, and miscellaneous hardscape and landscape improvements.

Contact Information

Name
Steve Carrillo
Agency Name
City of Irvine
Job Title
Manager of Engineering/City Engineer
Contact Types
Lead/Public Agency

Name
Jorge Estrada
Agency Name
PlaceWorks
Job Title
Senior Associate
Contact Types
Consulting Firm

Location

Cities
Irvine
Counties
Orange
Regions
Citywide, Southern California
Cross Streets
Oak Canyon and San Canyon Avenue
Zip
92618
Total Acres
18.7
Parcel #
466-01-123, -133, -135, and -114
State Highways
Interstate 5
Railways
Metrolink/Amtrack
Airports
None
Schools
Irvine Valley College
Waterways
None
Township
6N
Range
8W
Section
6

Notice of Completion

Development Types
Other (Animal Care Center and City Operations Support Facility)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Local Review Period Start
Local Review Period End

Attachments

Download CSV Download All Attachments New Search Print