Phelan Pinon Hills Community Services District Wells No. 15 and 16 Development Project

3 Documents in Project

Summary

SCH Number
2022030213
Lead Agency
Phelan Pinon Hills Community Service District
Document Title
Phelan Pinon Hills Community Services District Wells No. 15 and 16 Development Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Rural Living
Document Description
The PPHCSD seeks to install two new wells as part of their Capital Improvement Projects, which would both aid the District in meeting current and future demand, and minimize Chromium-6 concentrations in the District’s water supply. These wells would be installed within the Phelan Community within the County of San Bernardino, within the District’s service area. Well 15 is proposed to be located on a 5-acre portion of a 40-acre parcel (Assessor’s Parcel Number [APN] 3101-31-01) north of the District, at the northwest corner of the intersection of Crudup Road and Azalea Road, on Azalea Road and Victor Street. The project will also include 5,900 lineal feet (LF) of 12” water pipeline, which will connect to the District’s existing water distribution system, which feeds reservoirs 2-1 and 2-2 on Sheep Creek Road. The pipeline is anticipated to be 12” diameter in size. The project will include a retention basin, a 10’ x 10’ chlorination structure, switch gear, and proposed transformer that will connect to an existing power pole opposite the project site along Azalea Road. The District is also planning to install a second well, Well No. 16, to connect to the District’s existing water distribution system. Well No. 16 is proposed to be installed on a 40-acre site the District currently owns along Sheep Creek Road, just north of the intersection of Sheep Creek Road and Cayucos Drive along the western side of the street (APN 3098-071-05). The site would include the following features: a 6” in diameter pipeline connecting to the District’s distribution system in Sheep Creek Road; a 4” drain line to the retention basin; a 10’ x 10’ chlorination building adjacent to the proposed well; and, a 4” conduit, switch gear, and transformer to connect to the existing powerline pole. Construction is anticipated to being in spring of 2022, with the wells becoming operational by the end of 2022.

Contact Information

Name
George Cardenas
Agency Name
Phelan Pinon Hills Community Services District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Regions
Countywide
Cross Streets
Maple Lane and Baldwin Lane
Zip
92315
Total Acres
< 5 acres
Parcel #
3101-031-04 3098-071-05
State Highways
18 & 138
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
California Aqueduct
Township
5N
Range
7W
Section
14
Base
SBBM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Toxic Substances Control, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights, California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW)
Development Types
Water Facilities (Wells & Pipeline)(Type Wells & Pipeline, MGD 1.08)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire

Attachments

State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print