Condor Battery Energy Storage Facility

2 Documents in Project

Summary

SCH Number
2021100199
Lead Agency
City of Grand Terrace
Document Title
Condor Battery Energy Storage Facility
Document Type
NOD - Notice of Determination
Received
Posted
12/7/2021
Document Description
The Project will consist of lithium-ion energy batteries installed on racks, inverters, switchgear, and other associated equipment to directly interconnect into the Southern California Edison Highgrove Substation (point of interconnection) located immediately adjacent to the north of the Project site. The energy storage batteries will be housed in containers or purpose-built cabinets/cubes. The Project will interconnect with the Highgrove Substation via an enclosed transformer substation area located at the north-central portion of the Project site. The enclosed transformer substation area includes a 34.5 kV/115kV main power transformer, a substation control enclosure, a switch and gear station, a 50-foot tall static mast for lightning, and a 40- foot tall overhead interconnection tower. The Project also includes a Variance (V 21-01) for exceedance of height restrictions.

Contact Information

Name
Steven Weiss, AICP
Agency Name
City of Grand Terrace
Job Title
Planning and Development Services Director
Contact Types
Lead/Public Agency

Location

Cities
Grand Terrace
Counties
San Bernardino
Regions
Citywide
Cross Streets
Main Street and Taylor Street
Zip
92313
Total Acres
9.86
Jobs
1
Parcel #
1167-151-77-0000
State Highways
I-215
Railways
BNSF, Metrolink
Airports
None
Schools
Multiple
Waterways
None
Township
N/A
Range
N/A
Section
N/A
Base
N/A

Notice of Determination

Approving Agency
City of Grand Terrace
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
https://www.grandterrace-ca.gov/departments/planning_development_services

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.