SCH Number 2021100199


Project Info

Title
Condor Battery Energy Storage Facility
Description
The Project will consist of lithium-ion energy batteries installed on racks, inverters, switchgear, and other associated equipment to directly interconnect into the Southern California Edison Highgrove Substation (point of interconnection) located immediately adjacent to the north of the Project site. The energy storage batteries will be housed in containers or purpose-built cabinets/cubes. The Project will interconnect with the Highgrove Substation via an enclosed transformer substation area located at the north-central portion of the Project site. The enclosed transformer substation area includes a 34.5 kV/115kV main power transformer, a substation control enclosure, a switch and gear station, a 50-foot tall static mast for lightning, and a 40-foot tall overhead interconnection tower. The Project also includes a Variance (V 21-01) for exceedance of height restrictions.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Grand Terrace Condor Battery Energy Storage Facility
City of Grand Terrace Condor Battery Energy Storage Facility