Upper Valle de los Caballos Regional Pump Station [Project No. D1903]

2 Documents in Project

Summary

SCH Number
2020049017
Lead Agency
Rancho California Water District
Document Title
Upper Valle de los Caballos Regional Pump Station [Project No. D1903]
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2020
Document Description
Upper Valle de las Caballos (UVDC) Regional Pump Station [Project No. D1903] will increase capacity at the UVDC Regional Pump Station and provide operational benefits to Rancho Water. New facilities will augment capacity in the 1305 and 1380 Pressure Zones ai;id will include the following components: imported fill material to raise the site pad above existing ground elevation; chlorine contact tank for groundwater disinfection; on-site sodium hypochlorite generation and feed system; wet well and transition pipeline to direct flow from the contact tank to the pump station; extension of the existing ammonia feed facility; discharge piping; vertical turbine pumps; and two (2) new wells.

Contact Information

Name
Jacob Wiley
Agency Name
Rancho California Water District
Contact Types
Lead/Public Agency

Name
Agency Name
Rancho California Water District
Contact Types
Project Applicant

Location

Cities
Temecula
Counties
Riverside
Other Location Info
South of De Portola Road; east of Pauba Road; and along/east of Conquistador Place; portions of De Portola Road. See attached Figure 1: Project Vicinity.

Notice of Determination

Approving Agency
Rancho California Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print