Upper Valle de los Caballos Regional Pump Station [Project No. D1903]
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020049017
- Lead Agency
- Rancho California Water District
- Document Title
- Upper Valle de los Caballos Regional Pump Station [Project No. D1903]
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/12/2020
- Document Description
- Upper Valle de las Caballos (UVDC) Regional Pump Station [Project No. D1903] will increase capacity at the UVDC Regional Pump Station and provide operational benefits to Rancho Water. New facilities will augment capacity in the 1305 and 1380 Pressure Zones ai;id will include the following components: imported fill material to raise the site pad above existing ground elevation; chlorine contact tank for groundwater disinfection; on-site sodium hypochlorite generation and feed system; wet well and transition pipeline to direct flow from the contact tank to the pump station; extension of the existing ammonia feed facility; discharge piping; vertical turbine pumps; and two (2) new wells.
- Contact Information
-
Jacob Wiley
Rancho California Water District
Lead/Public Agency
42135 Winchester Road
Temecula, CA 92589-9017
Phone : (951) 296-6980
-
Rancho California Water District
Project Applicant
Location
- Cities
- Temecula
- Counties
- Riverside
- Other Location Info
- South of De Portola Road; east of Pauba Road; and along/east of Conquistador Place; portions of De Portola Road. See attached Figure 1: Project Vicinity.
Notice of Determination
- Approving Agency
- Rancho California Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Rancho California Water District (Lead Agency) 42135 Winchester Road Temecula, CA 92590
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- 2020049017_NOD Project No PDF 2519 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.