SCH Number 2020049017


Project Info

Title
Upper Valle De Los Caballos Regional Pump Station [Project No. D1903]
Description
e Upper Valle de las Caballos (UVDC) Regional Pump Station Project [Project No. Dl 903] will increase capacity at the UVDC Regional Pump Station and provide operational benefits to Rancho Water. New facilities will augment capacity in the 1305 and 1380 Pressure Zones and will include the following components: imported fill material to raise the site pad above existing ground elevation; chlorine contact tank for groundwater disinfection; on-site sodium hypochlorite generation and feed system; wet well and transition pipeline to direct flow from the contact tank to the pump station; extension of the existing ammonia feed facility; discharge piping; vertical turbine pumps; and two (2) new wells.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Rancho California Water District Upper Valle de los Caballos Regional Pump Station [Project No. D1903]
Rancho California Water District Upper Valle De Los Caballos Regional Pump Station [Project No. D1903]