City of Beverly Hills, La Brea Subarea Well and Transmission Main Project
3 Documents in Project
Summary
SCH Number
2019099076
Lead Agency
City of Beverly Hills
Document Title
City of Beverly Hills, La Brea Subarea Well and Transmission Main Project
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2019
Document Description
The proposed project would include the construction of a groundwater production well in the La Brea Subarea (that would provide approximately 1,700 AFY of new water supply), the rehabilitation of an existing (inactive) 18 and 24-inch pipelines, and the connection of the rehabilitated pipeline to a newly constructed raw water transmission main with a diameter of 16-inches ( collectively, referred to herein as "proposed transmission main"). The proposed transmission main would connect the proposed production well to the existing Foothill Water Treatment Plant (WTP) for treatment and supply. The pipelines would be sized to accommodate 3,000 gallons per minute (gpm), which would be from the currently proposed well and, potentially, other wells in the area although the need for and locations of any such future wells is an unknown at this time.
Contact Information
Name
Tristan Malabanan
Agency Name
City of Beverly Hills
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Cities of Los Angeles and Beverly Hills Los Angeles County
Contact Types
Project Applicant
Location
Cities
Beverly Hills, Los Angeles
Counties
Los Angeles
Notice of Determination
Approving Agency
City of Beverly Hills
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.