City of Beverly Hills, La Brea Subarea Well and Transmission Main Project

2 Documents in Project

Summary

SCH Number
2019099076
Lead Agency
Beverly Hills, City of (City of Beverly Hills)
Document Title
City of Beverly Hills, La Brea Subarea Well and Transmission Main Project
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2019
Project Applicant
Cities of Los Angeles and Beverly Hills Los Angeles County

Document Description
The proposed project would include the construction of a groundwater production well in the La Brea Subarea (that would provide approximately 1,700 AFY of new water supply), the rehabilitation of an existing (inactive) 18 and 24-inch pipelines, and the connection of the rehabilitated pipeline to a newly constructed raw water transmission main with a diameter of 16-inches ( collectively, referred to herein as "proposed transmission main"). The proposed transmission main would connect the proposed production well to the existing Foothill Water Treatment Plant (WTP) for treatment and supply. The pipelines would be sized to accommodate 3,000 gallons per minute (gpm), which would be from the currently proposed well and, potentially, other wells in the area although the need for and locations of any such future wells is an unknown at this time.

Contact Information
Tristan Malabanan
City of Beverly Hills
Public Works Department, Engineering Division 345 Foothill Road
Beverly Hills, CA 90210

Phone : (301) 285-2467

Location

Cities
Beverly Hills Los Angeles
Counties
Los Angeles

Notice of Determination

Approving Agency
City of Beverly Hills
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Beverly Hills Public Works Building, 345 Foothill Road, Beverly Hills, CA 90210

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2019099076   PDF 2188 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print