SCH Number 2019099076
Project Info
- Title
- La Brea Subarea Well and Transmission Main Project
- Description
- The proposed project would include the construction of a groundwater production well in the La Brea Subarea (that would provide approximately 1,700 AFY of new water supply), the rehabilitation of an existing (inactive) 18 and 24-inch pipelines, and the connection of the rehabilitated pipeline to a newly constructed raw water transmission main with a diameter of 16-inches (collectively, referred to herein as "proposed transmission main"). The proposed transmission main would connect the proposed production well to the existing Foothill Water Treatment Plant (WTP) for treatment and supply. The pipelines would be sized to accommodate 3,000 gallons per minute (gpm), which would be from the currently proposed well and, potentially, other wells in the area although the need for and locations of any such future wells is unknown at this time.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of Beverly Hills | La Brea Subarea Well (La Cienega Well 1) and Transmission Main Project | |
NOD | City of Beverly Hills | City of Beverly Hills, La Brea Subarea Well and Transmission Main Project | |
MND | City of Beverly Hills | La Brea Subarea Well and Transmission Main Project |