CNPRC Central Plant and Energy Improvements

39 Documents in Project

Summary

SCH Number
2017012008
Lead Agency
University of California, Davis
Document Title
CNPRC Central Plant and Energy Improvements
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2020
Present Land Use
Academic and Research
Document Description
Notice of Determination for the Addendum September 30, 2019 to the UC Davis 2018 Long Range Development Plan (LRDP) EIR. The CNPRC Central Plant and Energy Improvements project will replace the inefficient heating and cooling equipment with a new energy-efficient system. The project includes constructing a new central heating and cooling plant in a modular building (approx. 3,000 SF) on the south side of the district within an existing parking lot. A new solar/thermal panel field (approx. 300 collectors covering 12,000 SF) will be installed and heat collected by the solar collectors will be piped underground to the new central plant. A new underground heating hot water distribution system will be installed to pipe the output of the solar thermal system and peaking hot water boilers to the buildings served. This improvement will provide limited additional capacity for near term growth within CNPRC.

Contact Information

Name
Matt Dulcich
Agency Name
University of California Davis
Contact Types
Lead/Public Agency

Name
Agency Name
University of California Davis
Contact Types
Project Applicant

Location

Counties
Yolo
Regions
Northern California
Cross Streets
County Road 98 and Hutchison Drive
Zip
95616
Other Location Info
California National Primate Research Center at the University of California Davis

Notice of Determination

Approving Agency
University of California Davis
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum September 30, 2019 to the UC Davis 2018 LRDP EIR)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print